A Descriptive Study of Gas Pipeline Route Selection in West Georgia, USSR

Mechitov AI (1982). A Descriptive Study of Gas Pipeline Route Selection in West Georgia, USSR. IIASA Working Paper. IIASA, Laxenburg, Austria: WP-82-056

[img]
Preview
Text
WP-82-056.pdf

Download (703kB) | Preview

Abstract

This paper describes the main issues involved in the selection of a gas pipeline route in West Georgia, USSR. The important factors taken into consideration during selection are depicted and attitudes of the decision making parties concerning the problem are shown. The MAMP descriptive model elaborated at IIASA is applied to the case given. Some prescriptive measures for improving the existing decision making system are proposed.

Item Type: Monograph (IIASA Working Paper)
Research Programs: Management and Technology Area (MMT)
Depositing User: IIASA Import
Date Deposited: 15 Jan 2016 01:51
Last Modified: 18 Nov 2016 05:45
URI: http://pure.iiasa.ac.at/1960

Actions (login required)

View Item View Item

International Institute for Applied Systems Analysis (IIASA)
Schlossplatz 1, A-2361 Laxenburg, Austria
Phone: (+43 2236) 807 0 Fax:(+43 2236) 71 313