Andersson, A.M., Elverhoi, M., Fleten, S-E., Fuss, S., Szolgayova, J., & Troland, O.C. (2014). Upgrading hydropower plants with storage: Timing and capacity choice. Energy Systems 5 (2) 233-252. 10.1007/s12667-013-0112-2.
Full text not available from this repository.Abstract
This paper presents an investment decision support framework for a hydropower producer with storage facilities that is considering upgrading the production capacity in its power plant. A real options framework is proposed to support the investment decision, where both investment timing and capacity choice are considered. Using a case from a Norwegian hydropower producer, we employ the framework to evaluate investment opportunities in this company. Our main contribution is an approach that combines hydropower scheduling and real options valuation for already constructed power plants. Furthermore, the results from our case analysis suggest feasible investment strategies or the hydropower producer.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Real options; Electricity price uncertainty; Upgrading; Refurbishment; Timing; Capacity choice |
Research Programs: | Ecosystems Services and Management (ESM) |
Bibliographic Reference: | Energy Systems; 5(2):233-252 (June 2014) (Published online 22 December 2013) |
Depositing User: | IIASA Import |
Date Deposited: | 15 Jan 2016 08:50 |
Last Modified: | 27 Aug 2021 17:39 |
URI: | https://pure.iiasa.ac.at/10917 |
Actions (login required)
View Item |