<mets:mets OBJID="eprint_14474" LABEL="Eprints Item" xsi:schemaLocation="http://www.loc.gov/METS/ http://www.loc.gov/standards/mets/mets.xsd http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" xmlns:mets="http://www.loc.gov/METS/" xmlns:mods="http://www.loc.gov/mods/v3" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><mets:metsHdr CREATEDATE="2024-01-01T21:23:42Z"><mets:agent ROLE="CUSTODIAN" TYPE="ORGANIZATION"><mets:name>IIASA Repository</mets:name></mets:agent></mets:metsHdr><mets:dmdSec ID="DMD_eprint_14474_mods"><mets:mdWrap MDTYPE="MODS"><mets:xmlData><mods:titleInfo><mods:title>Locating charging infrastructure for electric buses in Stockholm</mods:title></mods:titleInfo><mods:name type="personal"><mods:namePart type="given">M.</mods:namePart><mods:namePart type="family">Xylia</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:name type="personal"><mods:namePart type="given">S.</mods:namePart><mods:namePart type="family">Leduc</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:name type="personal"><mods:namePart type="given">P.</mods:namePart><mods:namePart type="family">Patrizio</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:name type="personal"><mods:namePart type="given">F.</mods:namePart><mods:namePart type="family">Kraxner</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:name type="personal"><mods:namePart type="given">S.</mods:namePart><mods:namePart type="family">Silveira</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:abstract>Charging infrastructure requirements are being largely debated in the context of urban energy planning for transport electrification. As electric vehicles are gaining momentum, the issue of locating and securing the availability, efficiency and effectiveness of charging infrastructure becomes a complex question that needs to be addressed. This paper presents the structure and application of a model developed for optimizing the distribution of charging infrastructure for electric buses in the urban context, and tests the model for the bus network of Stockholm. The major public bus transport hubs connecting to the train and subway system show the highest concentration of locations chosen by the model for charging station installation. The costs estimated are within an expected range when comparing to the annual bus public transport costs in Stockholm. The model could be adapted for various urban contexts to promptly assist in the transition to fossil-free bus transport. The total costs for the operation of a partially electrified bus system in both optimization cases considered (cost and energy) differ only marginally from the costs for a 100% biodiesel system. This indicates that lower fuel costs for electric buses can balance the high investment costs incurred in building charging infrastructure, while achieving a reduction of up to 51% in emissions and up to 34% in energy use in the bus fleet.</mods:abstract><mods:originInfo><mods:dateIssued encoding="iso8601">2017-05</mods:dateIssued></mods:originInfo><mods:originInfo><mods:publisher>Elsevier</mods:publisher></mods:originInfo><mods:genre>Article</mods:genre></mets:xmlData></mets:mdWrap></mets:dmdSec><mets:amdSec ID="TMD_eprint_14474"><mets:rightsMD ID="rights_eprint_14474_mods"><mets:mdWrap MDTYPE="MODS"><mets:xmlData><mods:useAndReproduction>
<p xmlns="http://www.w3.org/1999/xhtml"><strong>For work being deposited by its own author:</strong>
In self-archiving this collection of files and associated bibliographic
metadata, I grant IIASA Repository the right to store
them and to make them permanently available publicly for free on-line.
I declare that this material is my own intellectual property and I
understand that IIASA Repository does not assume any
responsibility if there is any breach of copyright in distributing these
files or metadata. (All authors are urged to prominently assert their
copyright on the title page of their work.)</p>

<p xmlns="http://www.w3.org/1999/xhtml"><strong>For work being deposited by someone other than its
author:</strong> I hereby declare that the collection of files and
associated bibliographic metadata that I am archiving at
IIASA Repository) is in the public domain. If this is
not the case, I accept full responsibility for any breach of copyright
that distributing these files or metadata may entail.</p>

<p xmlns="http://www.w3.org/1999/xhtml">Clicking on the deposit button indicates your agreement to these
terms.</p>
    </mods:useAndReproduction></mets:xmlData></mets:mdWrap></mets:rightsMD></mets:amdSec><mets:fileSec><mets:fileGrp USE="reference"><mets:file ID="eprint_14474_76729_1" SIZE="1093039" OWNERID="https://pure.iiasa.ac.at/id/eprint/14474/1/Locating%20charging%20infrastructure%20for%20electric%20buses%20in%20Stockholm.pdf" MIMETYPE="application/pdf"><mets:FLocat LOCTYPE="URL" xlink:type="simple" xlink:href="https://pure.iiasa.ac.at/id/eprint/14474/1/Locating%20charging%20infrastructure%20for%20electric%20buses%20in%20Stockholm.pdf"></mets:FLocat></mets:file></mets:fileGrp></mets:fileSec><mets:structMap><mets:div DMDID="DMD_eprint_14474_mods" ADMID="TMD_eprint_14474"><mets:fptr FILEID="eprint_14474_document_76729_1"></mets:fptr></mets:div></mets:structMap></mets:mets>