Heuristic Algorithm for Production Control of an Integrated Pulp and Paper Mill

Leiviskä, K., Komokallio, H., Aurasmaa, H., & Uronen, P. (1980). Heuristic Algorithm for Production Control of an Integrated Pulp and Paper Mill. IFAC Proceedings Volumes 13 (6) 551-561. 10.1016/S1474-6670(17)64839-0.

Full text not available from this repository.

Abstract

The work reported here is a part of a larger development project going on in the Division of Control Engineering, University of Oulu in cooperation with some Finnish pulp and paper industry. In this project the development of the hierarchical dynamic production control system for an integrated pulp and paper mill is studied. The whole system will include a paper mill, pulp lines of the mill, a chemical recovery cycle and the whole energy system of the mill.

Based on the mathematical models a general simulation program package for the production control was developed. The scheduling is based on repeated simulations and on some simple logical rules for the calculation of the production schedules. The scheduling proceeds iteratively from a given production schedule to a production schedule that satisfies the system contstraints.

Item Type: Article
Uncontrolled Keywords: Production control; simulation; heuristic programming; hierarchical systems; pulp and paper mill
Depositing User: Luke Kirwan
Date Deposited: 04 Jul 2017 11:28
Last Modified: 27 Aug 2021 17:41
URI: https://pure.iiasa.ac.at/14706

Actions (login required)

View Item View Item