This study proposes a novel two-phase model framework for designing sustainable biomass supply chains of Community-Scale Biomass Power Plants (CSBPPs) by optimization based on geospatial-based Multi-criteria Decision Making (MCDM), the Analytic Hierarchy Process (AHP) method and the Location–Allocation Model. Phase I involved land suitability criteria prioritization and suitable land area analysis. The location–allocation model was the main tool used in Phase II to identify optimal locations, followed by the analysis of the levelized cost of electricity (LCOE). The model optimized site location based on the availability (remaining) of local crop residues, electricity demand, road networks and other key criteria for power plant development, such as the location of substations and the location of existing power plants. The results show that the estimated total remaining crop residue potential in the EEC region was 2403 kt/year, which can generate approximately 34,156 TJ. The location–allocation model identified the top five locations for CSBPPs. The total required installed capacity of these five locations was approximately 100.23 MW in order to serve the district energy demand by the residential sector of 793.82 million (kWh/year). Assuming direct combustion-steam turbine technology with an installed capacity of 6–10 MW, the average LCOE was found to be in a range of $0.076 to $0.081 USD/kWh.

Item Type: Article
Uncontrolled Keywords: distributed energy generation; community-scale biomass power plant; sustainable supply chain; location–allocation model; optimal locations; plant-level levelized cost of electricity
Research Programs: Biodiversity and Natural Resources (BNR)
Biodiversity and Natural Resources (BNR) > Agriculture, Forestry, and Ecosystem Services (AFE)
Depositing User: Luke Kirwan
Date Deposited: 24 Feb 2025 09:05
Last Modified: 12 Mar 2025 05:01
URI: https://pure.iiasa.ac.at/20423

Actions (login required)

View Item View Item